Customization: | Available |
---|---|
After-sales Service: | 6 Months |
Warranty: | 6 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The layout of the general vacuum press and its auxiliary equipment are similar to those of the general press. However, the eccentric direction of the vacuum press is opposite to that of the ordinary press, that is, the upper press roll is offset from the lower roll by 50-60mm in the disposal direction.
The function of the vacuum degree of the inner cavity of the vacuum press roll is to force the moisture extruded from the nip to pass through the felt, and enter the inner cavity of the roll shell through the through hole on the vacuum roll. This process takes a certain amount of time. The higher the vacuum in the vacuum zone of the vacuum roll, the shorter the time, and the more water will be sucked out in the same time, and the more paper will be dehydrated, which is the dewatering capacity of the vacuum roll. The stronger.
Working face | 1400mm-6800mm |
Diameter | 600mm-1300mm |
Center distance | 1600mm-7000mm |
Rubber thickness | 20mm-40mm |
Suction width | 3000mm-5000mm |
1.Q: Will you send engineers to design our plant and install the equipment?
A: Yes, Our factory will arrange engineer to supply the professional drawing and install and train the workers about adjusting the equipment ,disposing of the trouble maybe happen and maintenance of the machine, after training,the workers will get work license we distribute.
2.Q:What is the delivery time if we make a order from you?
A:Usually, the delivery time for smaller machines is 10-30 days after receiving deposit,But for bigger machines, it will be longer to make sure the equipment quality.
3.Q:Can we visit your factory?
A:Welcome to visit our factory,you can check out equipment and running paper machine production line. What is more,you can discuss with our engineers directly.