Customization: | Available |
---|---|
After-sales Service: | 12 Months |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
After the pulp is uniformly treated in the paper making process, because the pulp contains a large amount of water, it needs to be pressed to discharge the water during the forming process of the paper product. The combination roll is a commonly use dehydration part on the paper machine, and a large amount of water is evenly arranged on the surface. Hole, in the process of paper processing and production, it is necessary to use a combination roll to remove the moisture in the pulp. By opening a water absorption hole on the surface of the roll body, a large amount of water contained in the pulp can be absorbed during the paper making process. At the same time, the water absorption hole has an inverted trapezoidal structure with a wide upper and a narrow bottom, which can improve the dehydration efficiency. The connection between the roll body and the connecting shaft The operating side shaft head and plastic sealing plate are arranged at the place to ensure that the impurity in the pulp will not affect the transmission efficiency of the connecting shaft during the rotation of the roller body.
Working face | 1600-6200mm |
Diameter | 650-1000mm |
Center distance | 1650-7000mm |
Working speed | Customized according to customer requirements |
Dynamic balance speed | Set according to customer working speed |
Shell material | 0Cr17 or 304SS |
Hole size | 5.5mm-9mm |
Can be completely customized according to customer requirements |
1.Q: Will you send engineers to design our plant and install the equipment?
A: Yes, Our factory will arrange engineer to supply the professional drawing and install and train the workers about adjusting the equipment ,disposing of the trouble maybe happen and maintenance of the machine, after training,the workers will get work license we distribute.
2.Q:What is the delivery time if we make a order from you?
A:Usually, the delivery time for smaller machines is 10-30 days after receiving deposit,But for bigger machines, it will be longer to make sure the equipment quality.
3.Q:Can we visit your factory?
A:Welcome to visit our factory,you can check out equipment and running paper machine production line. What is more,you can discuss with our engineers directly.