Customization: | Available |
---|---|
After-sales Service: | 12 Months |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
It is divided into upper and lower sizing rollers. This rubber roller is composed of a thick-walled cast iron pipe, a bulky head, and a combination of drying and installation of the shaft head. The roller surface is covered with rubber, and the shaft end is equipped with a bearing seat, a bearing cap, and a bearing.
2:When the operating pressure of the sizing roller is greater than or equal to 80KN/M or the operating speed is greater than or equal to 600M/MIN. Then the roller core of the sizing roller should be equipped with a water cooling system. For this reason, when the sizing roller and another sizing roller with a surface temperature of ≥95°C are mutually released and used, the cooling system measures mentioned above need to be taken. The amount of water used for water cooling must be sufficient, and the temperature difference between inlet and outlet water should be ≤5°C.
Working face | 1600mm-6200mm |
Diameter | 400mm-700mm |
Center distance | 1900mm-6500mm |
Suction width | 3000mm-5000mm |
Drill hole diameter | 5mm-10mm |
1.Q: Will you send engineers to design our plant and install the equipment?
A: Yes, Our factory will arrange engineer to supply the professional drawing and install and train the workers about adjusting the equipment ,disposing of the trouble maybe happen and maintenance of the machine, after training,the workers will get work license we distribute.
2.Q:What is the delivery time if we make a order from you?
A:Usually, the delivery time for smaller machines is 10-30 days after receiving deposit,But for bigger machines, it will be longer to make sure the equipment quality.
3.Q:Can we visit your factory?
A:Welcome to visit our factory,you can check out equipment and running paper machine production line. What is more,you can discuss with our engineers directly.